G4A01 Thermal Link Long Leads Microtemp TCO Fuse For Temperature Protection
Product Details:
| Place of Origin: | China |
| Brand Name: | Microtemp |
| Certification: | UL VDE PSE CCC |
| Model Number: | G4A01 |
Payment & Shipping Terms:
| Minimum Order Quantity: | 5000 |
|---|---|
| Price: | USD $0.1~$0.15 per piece |
| Packaging Details: | 500pcs per bag, 20000pcs per carton |
| Delivery Time: | 15 days |
| Payment Terms: | T/T |
| Supply Ability: | 50K pieces per month |
|
Detail Information |
|||
| Item Name: | Thermal Fuse, Thermal Cutoff, Thermal Link | Part No.: | G4A01 |
|---|---|---|---|
| Voltage Rating: | 250V | Current Rating: | 10A |
| Tf: | 66~240 Degree | Mounting Type: | Axial Leaded |
| Blow Type: | One Shot Operation | Case Type: | Metal |
| UL Listed: | Yes | RoHS Compliant: | Yes |
| Halogen Free: | Yes | MPQ: | 500pcs |
| MOQ: | 5000pcs | ||
| Highlight: | 10A Thermal Fuse Links 250V,TCO Thermal Fuse Links,1mm Lead Dia Thermal Fuse Links |
||
Product Description
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection
MICROTEMP Thermal Cutoffs are designed for thermal protection as electrical cut off
Product Description
| Item | thermal fuse, thermal cutoff, thermal link |
| Body Tyle | Metal |
| Lead Dia | 1mm |
| Lead Length | see table 3 |
| Current Rating | 10A@250VAC |
| Mounting Type | axial leaded |
| Body Dia | 4mm |
| Body Length | 14.7mm |
| Certifications | UL VDE |
Specification
| Tf ºC | G4A01 | Th ºC | Tm ºC |
| 72 | G4A01072C | 57 | 100 |
| 73 | G4A01073C | 58 | 100 |
| 77 | G4A01077C | 62 | 300 |
| 84 | G4A01084C | 69 | 220 |
| 91 | G4A01091C | 76 | 300 |
| 93 | G4A01093C | 78 | 300 |
| 98 | G4A01098C | 83 | 300 |
| 104 | G4A01104C | 89 | 200 |
| 110 | G4A01110C | 95 | 240 |
| 117 | G4A01117C | 102 | 240 |
| 121 | G4A01121C | 106 | 300 |
| 125 | G4A01125C | 110 | 185 |
| 128 | G4A01128C | 113 | 205 |
| 134 | G4A01134C | 119 | 205 |
| 141 | G4A01141C | 126 | 205 |
| 144 | G4A01144C | 129 | 300 |
| 152 | G4A01152C | 137 | 205 |
| 158 | G4A01158C | 143 | 240 |
| 167 | G4A01167C | 152 | 210 |
| 172 | G4A01172C | 157 | 310 |
| 184 | G4A01184C | 169 | 240 |
| 190 | G4A01190C | 175 | 350 |
| 192 | G4A01192C | 177 | 210 |
| 205 | G4A01205C | 190 | 310 |
| 216 | G4A01216C | 200 | 450 |
| 229 | G4A01229C | 200 | 450 |
| 240 | G4A01240C | 200 | 450 |
| 257 | G4A01257C | 220 | 470 |
Dimension
![]()
Leads length can be customized
Electrical Ratings
| Series | G4 | G5 | |
| Agency | Resistive | Inductive | Resistive |
| UL/CSA | 21A/240VAC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | 14A/120VAC | 25A/120VAC | |
| 15A/120AC | 21A/240VAC | ||
| 5A/24VDC | 20A/277VAC | ||
| VDE | 10A/250VAC | 8A/250VAC | 20A/250VAC |
| CCC | 5A/24VDC | 8A/250VAC | 20A/250VAC |
| 10A/250VAC | |||
| PSE JET | 10A/250VAC | 15A/250VAC | |
Standard Package
500pcs per bag, 20000pcs per carton
Shipping Term:
EXW, DDU, DDP, C&F, FOB
Shipping Methods:
International Express, By Air, By Sea
-

-
Company warehouse
-

-
Q1: What are your main products?
A1: fuses, fuse holders, thermal switches, circuit breakers
Q2: How long is your delivery time?
A2: It depends on your qty. Most of the items are available within 15 days.
Q3: How can I get a sample? Is that for free?
A3: You are always welcome for requesting samples. Most of the samples are free of charge. But you will have to bear the express cost.
Q4:How can I get a more competitive price?
A4:Usually our quotation is made based on the order qty. You need to increase your qty if you demands lower prices.We can't sacriface the quality for lower pricing and profit.
Q5:How do you control your quality system?
A5: We have enough number of QC staff at every stage from adopting materials, productionion, packing to loading, They are on for 7/24.
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection
Q6:How long is your warranty period?
A6: Normally you will have 1-year warranty for most of our products.
G4A01 thermal link Long Leads Microtemp TCO Fuse for Temperature Protection





